This page uses javascript to help render elements, if you have problems please enable javascript.
 
You are now inside the main content area
 
 
 
left col

Energy Setup and Information

right col
 
left col

Setup Time Estimates

Setup Time Estimates
Initials of Tech Doing Setup Time Taken Notes
     
right col
 
left col

Equipment

right col
 
 
 
left col

Student Stations

  • 1 track
  • 2 Stop Brackets
  • 1 Blue/red Cart
  • Signal blocker attached to cart on spring pillar side.
  • 1 Cart Striker (Short metal rod)
  • 1 Mass Support
  • 1 ruler
  • 1 set of large masses (2x100g, 1x200g, 1x500g)
    • (Lab Needs to measure 200g, 400g, 600g, 800g)
  • One Motion Sensor
    • Placed behind black stop bracket closest to PC.

Instructor Stations

  • Box of Sand Bags
  • Step ladder

lab equipement used

right col
 
left col

Setup Instructions

right col
 
 
left col

Student Stations

  1. Verify that all materials are present before proceeding to setup lab.
  2. Place tracks at the station matching their labelled numbers with ruler facing toward students.
  3. Tracks no longer need to be against flat surface but make sure stop bracket is firmly attached to each side.

Instructor Station

  1. Connect the lab pro to the smart board and set out 2 sand bags.
  2. Place step ladder below motion sensor.
  3. Calibrate smartboard PC motion sensor to proper distance.
right col
 
left col

Teardown Notes

  • None
right col
 
left col

Documents

right col
 
 
left col

In Progress / Beta

right col